Sunday, December 14, 2014

IT 1008 [New code: IT 2032 Software Testing, 07th Semester May June 2009 Question Paper

Anna University Chennai
B. E./B. Tech. DEGREE EXAMINATION, MAY/JUNE 2009.
Eighth Semester [Now 07th Semester in R-2008]
Information Technology
IT 1008 - SOFTWARE TESTING
(Regulation 2004)
Time: Three hours
Maximum: 100 marks
Answer ALL questions.
PART A - (10 x 2 = 20 marks)
1. List any two classifications of defect.
2. Distinguish between fault and failure;
3. Which Testing strategy is best to uncover the defect? Why?
4. What is a control flow graph?
5. How would you define a software unit for object oriented code?
6. Why is it so important to design a test harness for re-usability?
7. List any two importance of testing plan.
8. What is role of manager in support of test group?
9. What should be included in milestone report for testing?
10.Define test measurement process.
PART B - (5 X 16 = 80 marks)
11. (a) (i) Why is it important to meticulously inspect test result? Give Example.(10)
(ii)Discuss the drawbacks in case if you fail to inspect(6)
OR
(b) (i)Why is it necessary to develop test cases for both valid and invalid input condition? (8)
(ii) How important is document for product? How will you test requirement and design
document? (8)
12. (a) Develop black-box test cases using equivalence class partitioning and boundary value analysis to test a module for ATM system. (16)
OR
(b) Imagine yourself as a developer of flight control system. Describe any three test adequacy criteria you would consider applying to develop test cases for flight Control system. 16)
13. (a) List and explain types of system test(16)
OR
(b) Develop a use case to describe a user purchase of a laptop with credit card from a online vendor using web-based software. With use case,design a set of tests you would use during system test. (16)
14. (a)Why is testing plan important for developing a repeatable and managed testing process? Give example. (16)
Or
(b)What role do user/client play in the development of test-plan for a project? Should they be present at any of the test plan reviews. Justify your answer. (16)
15. (a)If you are developing a patient record system for health care centre, why of the stop test will be most appropriate for this system? (16)
OR
(b) What is the role of the tester in supporting, monitoring and controlling of testing? (16)
Share This
Previous Post
Next Post

B.E Civil Engineer Graduated from Government College of Engineering Tirunelveli in the year 2016. She has developed this website for the welfare of students community not only for students under Anna University Chennai, but for all universities located in India. That's why her website is named as www.IndianUniversityQuestionPapers.com . If you don't find any study materials that you are looking for, you may intimate her through contact page of this website to know her so that it will be useful for providing them as early as possible. You can also share your own study materials and it can be published in this website after verification and reviewing. Thank you!

0 comments:

Pen down your valuable important comments below

Search Everything Here