ME2036 Production Planning and Control Nov Dec 2015 Important Questions

Are you looking for important question papers of ME2036 Production Planning and Control ? You can here collect important questions of Anna University Chennai B.E ME2036 Production Planning and Control for 08th Semester B.E Production / Mechanical Engineering. Look at the contents provided below to grab these important questions

Anna University Chennai
Department of B.E Production / Mechanical
Eighth Semester
ME2036 Production Planning and Control
November / December 2015 Exam Important Questions
(Regulation 2008)

Study Material Description : Anna University Chennai 2015 Important Questions of ME2036 Production Planning and Control for 08th Semester B.E Production / Mechanical Engineering 2015 Question Paper

IUQP Important Questions
Anna University, Chennai
Department of B.E- Production Engineering
B.E / B.TECH DEGREE EXAMINATION Nov / Dec 2015
EIGHT SEMESTER
ME2036 Production Planning and Control
(REGULATION 2008)

1. Given P/V= 25 % Material labour and O/H are distributed at 60.20 and 20 respectively. Assuming the fact that cost of production has gone up by 10%, 5% and 5% respectively for materials, labour and O/H to what extent should the sales price be increased to ensure that the contribution remains unchanged?

2. Explain production control in detail.

3. Explain economic analysis in detail

4. Draw and explain break-even analysis.

5. Write short notes on the following:
(i) Micro motion study (8)
(ii) Memomotion Study (8)



6. Explain the operation process chart with an example.

7. Compare fly-back and continuous method of stop watch measurement.

8. Explain the procedure involved in synthesizing from standard data

9. Explain briefly product of specifications and plan.

10. Explain various stages of value analysis.

11. State and explain the approaches of value engineering.

12. Define plant capacity, plant efficiency factor and plant correction factor.

13. Explain floor shop scheduling in detail


14. How can you apply MRP as scheduling system?

15. Briefly explain follow up process.

16. The following information is provided about the lead time and the demand pattern of a system.(i) Annual requirement 24,500 units (ii)Lead time 10 days (iii) There are 240 working days per year (iv) In the past 2 years the use rate has gone as high as 140 units per day. Calculate the required safety stock and re order level.

17. Derive the EOQ model with the different rates of demand in different production cycles.

18. Explain the various elements of JIT

19. Explain ABC analysis in detail

20. Explain concept MRP-ll in detail.

Share This
Previous Post
Next Post

B.E Civil Engineer Graduated from Government College of Engineering Tirunelveli in the year 2016. She has developed this website for the welfare of students community not only for students under Anna University Chennai, but for all universities located in India. That's why her website is named as www.IndianUniversityQuestionPapers.com . If you don't find any study materials that you are looking for, you may intimate her through contact page of this website to know her so that it will be useful for providing them as early as possible. You can also share your own study materials and it can be published in this website after verification and reviewing. Thank you!

0 comments:

Pen down your valuable important comments below

Search Everything Here