Dr. A.P.J. Abdul Kalam University
Bachelor of Engineering
Sixth Semester Examination, June-2021
Construction Planning & Management [CE-605]
Branch-Civil
Time: 3:00 Hrs Max Marks 70
Note: (i) Attempt any five questions. All question carry equal marks.
(ii) Assume suitable data necessary and state them clearly.
Q.1 (a) What are the optimistic, pessimistic and most likely time used in PERT?
(b) Compare programme evaluation and the review technique with critical path
method.
Q.2 (a) Describe the difference between CPM and PERT network.
(b) Describe meaning and significance of the following terms used in network
analysis.
(i) Cost slope (ii) Dummy activity (iii) Expected time
Q.3 (a) What type of personal management problems are likely in construction
Projects? How effectively these can be solved with available management
tools?
(b) Draw a neat sketch of job layout for the construction of multi-storeyed
building. Explain the different parts
Q.4 Explain in detail the following construction equipment‟s
(a) Pile driving
(b) Hoisting
(c) Compaction
Q.5 Discuss the following types of contract with their relative merits and
demerits
(a) Labour contract (b) Lump sum contract (c) Item rate contract
Q.6 Write detailed specification for the following
(a) First class brick masonry
(b) Plain concrete of M-20
Q.7 (a) What is the measurement book? How are the measurement recorded in it?
(b) What is meant by organisation chart? Explain with examples?
Q.8 (a) Draw the organisation chart of a small construction company?
Page[9]
(b) Write short notes on the following
(i) Safety engineering
(ii) Changes in contract